CW Interiors |
 
Search Result For Top News
Result(s) found: 2
Olympics Development
June 2015
KREOD Architecture has released its latest ambitious venture whose work is due to start in January 2016 with a construction period of 6 months. The International Trade Pavilion will be 20 times larger than the pavilion constructed for the London 2012 Olympic Games.
Pristine Pavilion
July 2014
London-based KREOD Architecture is all set to sculpt a trade Pavilion for the Rio Olympic Games. The firm has unveiled design images of about 13,000 sq ft. This grand white structure proposed for the 2016
1 
 

Advertise Here [728 W x 90 H pixels]